Priority-index based multi-priority relief logistics scheduling with greedy heuristic search

Research output: Contribution to conferencePaper

Abstract

Spontaneous response after any kind of disaster is essential to rescue victims at the disaster-affected regions. Efficient and effective relief logistics scheduling is crucial to reduce the disaster impact on the people in the affected areas. Such scheduling plan remains challenging in the field of relief logistics and related study areas because of the constraints such as time, cost, priorities and limited resources. Also, the nature of requirements of victims changes dynamically that makes the scheduling task more challenging. This leads to formulate a distinctive relief logistics scheduling covering disaster regions requirement and priorities. With the limited availability of the vehicles, the scheduling needs to be planned in iterative manner with the multiple time slots based on the availability of the vehicles. A greedy heuristic with priority based search generates the optimal set of scheduling sequences in the iterative time-slot scenarios. Covering priority aspect gives an effective alternative for the rational scheduling of the relief logistics. In this paper, we focus especially on an optimal weighted priority
relief logistics scheduling model based on different priorities
with least dependency on the choice of scheduling sequence. The
resulting model is appropriate for relief logistics scheduling in the
early phase of disaster response. The simulated result shows that
the weighted priority relief logistics scheduling model generates
comparatively better scheduling schedule in comparison with
sequences generated by applying the priorities individually
Original languageEnglish
Publication statusPublished - 4 Dec 2018
EventThe 5th International Conference on Information and Communication Technologies for Disaster Management - Tohoku University, Sendai, Japan
Duration: 4 Dec 20187 Dec 2018
Conference number: 5th
http://ict-dm2018.net/ (Conference website.)
http://ict-dm2018.net/ (Conference website)

Conference

ConferenceThe 5th International Conference on Information and Communication Technologies for Disaster Management
Abbreviated titleICT-DM2018
CountryJapan
CitySendai
Period4/12/187/12/18
Internet address

Fingerprint

Logistics
Scheduling
Disasters
Availability

Cite this

Mishra, B., Adhikari, T., Dahal, K., & Pervez, Z. (2018). Priority-index based multi-priority relief logistics scheduling with greedy heuristic search. Paper presented at The 5th International Conference on Information and Communication Technologies for Disaster Management, Sendai, Japan.
Mishra, Bhupesh ; Adhikari, Tek ; Dahal, Keshav ; Pervez, Zeeshan. / Priority-index based multi-priority relief logistics scheduling with greedy heuristic search. Paper presented at The 5th International Conference on Information and Communication Technologies for Disaster Management, Sendai, Japan.
@conference{1a6d596eff744ee894ecf433714156db,
title = "Priority-index based multi-priority relief logistics scheduling with greedy heuristic search",
abstract = "Spontaneous response after any kind of disaster is essential to rescue victims at the disaster-affected regions. Efficient and effective relief logistics scheduling is crucial to reduce the disaster impact on the people in the affected areas. Such scheduling plan remains challenging in the field of relief logistics and related study areas because of the constraints such as time, cost, priorities and limited resources. Also, the nature of requirements of victims changes dynamically that makes the scheduling task more challenging. This leads to formulate a distinctive relief logistics scheduling covering disaster regions requirement and priorities. With the limited availability of the vehicles, the scheduling needs to be planned in iterative manner with the multiple time slots based on the availability of the vehicles. A greedy heuristic with priority based search generates the optimal set of scheduling sequences in the iterative time-slot scenarios. Covering priority aspect gives an effective alternative for the rational scheduling of the relief logistics. In this paper, we focus especially on an optimal weighted priorityrelief logistics scheduling model based on different prioritieswith least dependency on the choice of scheduling sequence. Theresulting model is appropriate for relief logistics scheduling in theearly phase of disaster response. The simulated result shows thatthe weighted priority relief logistics scheduling model generatescomparatively better scheduling schedule in comparison withsequences generated by applying the priorities individually",
author = "Bhupesh Mishra and Tek Adhikari and Keshav Dahal and Zeeshan Pervez",
year = "2018",
month = "12",
day = "4",
language = "English",
note = "The 5th International Conference on Information and Communication Technologies for Disaster Management, ICT-DM2018 ; Conference date: 04-12-2018 Through 07-12-2018",
url = "http://ict-dm2018.net/, http://ict-dm2018.net/",

}

Mishra, B, Adhikari, T, Dahal, K & Pervez, Z 2018, 'Priority-index based multi-priority relief logistics scheduling with greedy heuristic search' Paper presented at The 5th International Conference on Information and Communication Technologies for Disaster Management, Sendai, Japan, 4/12/18 - 7/12/18, .

Priority-index based multi-priority relief logistics scheduling with greedy heuristic search. / Mishra, Bhupesh; Adhikari, Tek; Dahal, Keshav; Pervez, Zeeshan.

2018. Paper presented at The 5th International Conference on Information and Communication Technologies for Disaster Management, Sendai, Japan.

Research output: Contribution to conferencePaper

TY - CONF

T1 - Priority-index based multi-priority relief logistics scheduling with greedy heuristic search

AU - Mishra, Bhupesh

AU - Adhikari, Tek

AU - Dahal, Keshav

AU - Pervez, Zeeshan

PY - 2018/12/4

Y1 - 2018/12/4

N2 - Spontaneous response after any kind of disaster is essential to rescue victims at the disaster-affected regions. Efficient and effective relief logistics scheduling is crucial to reduce the disaster impact on the people in the affected areas. Such scheduling plan remains challenging in the field of relief logistics and related study areas because of the constraints such as time, cost, priorities and limited resources. Also, the nature of requirements of victims changes dynamically that makes the scheduling task more challenging. This leads to formulate a distinctive relief logistics scheduling covering disaster regions requirement and priorities. With the limited availability of the vehicles, the scheduling needs to be planned in iterative manner with the multiple time slots based on the availability of the vehicles. A greedy heuristic with priority based search generates the optimal set of scheduling sequences in the iterative time-slot scenarios. Covering priority aspect gives an effective alternative for the rational scheduling of the relief logistics. In this paper, we focus especially on an optimal weighted priorityrelief logistics scheduling model based on different prioritieswith least dependency on the choice of scheduling sequence. Theresulting model is appropriate for relief logistics scheduling in theearly phase of disaster response. The simulated result shows thatthe weighted priority relief logistics scheduling model generatescomparatively better scheduling schedule in comparison withsequences generated by applying the priorities individually

AB - Spontaneous response after any kind of disaster is essential to rescue victims at the disaster-affected regions. Efficient and effective relief logistics scheduling is crucial to reduce the disaster impact on the people in the affected areas. Such scheduling plan remains challenging in the field of relief logistics and related study areas because of the constraints such as time, cost, priorities and limited resources. Also, the nature of requirements of victims changes dynamically that makes the scheduling task more challenging. This leads to formulate a distinctive relief logistics scheduling covering disaster regions requirement and priorities. With the limited availability of the vehicles, the scheduling needs to be planned in iterative manner with the multiple time slots based on the availability of the vehicles. A greedy heuristic with priority based search generates the optimal set of scheduling sequences in the iterative time-slot scenarios. Covering priority aspect gives an effective alternative for the rational scheduling of the relief logistics. In this paper, we focus especially on an optimal weighted priorityrelief logistics scheduling model based on different prioritieswith least dependency on the choice of scheduling sequence. Theresulting model is appropriate for relief logistics scheduling in theearly phase of disaster response. The simulated result shows thatthe weighted priority relief logistics scheduling model generatescomparatively better scheduling schedule in comparison withsequences generated by applying the priorities individually

UR - http://ict-dm2018.net/program/

M3 - Paper

ER -

Mishra B, Adhikari T, Dahal K, Pervez Z. Priority-index based multi-priority relief logistics scheduling with greedy heuristic search. 2018. Paper presented at The 5th International Conference on Information and Communication Technologies for Disaster Management, Sendai, Japan.