TY - JOUR
T1 - On the extended use of auxiliary information under skewness correction for process monitoring
AU - Mehmood, Rashid
AU - Riaz, Muhammad
AU - Mahmood, Tahir
AU - Abbasi, Saddam Akbar
AU - Abbas, Nasir
PY - 2017/6/1
Y1 - 2017/6/1
N2 - In this article, we have extended the design structures of dual auxiliary information-based control charts under a variety of sampling strategies and runs rules schemes. We have considered the cases of known and unknown skewed distributions by using the skewness correction (SC) method. The design structures under the skewness correction method are based on the degree of skewness of the study variable, amount of correlation between study variable and auxiliary variable, and sample size. We have investigated the performance of the developed structures in terms of probability of signals, false alarm rate and average run length by considering the symmetrical distribution, skewed distributions, heavy tailed distributions and contamination environments. Outcomes of the current article showed that control charts based on extreme ranked set strategies have higher probability of detecting an out-of-control signal and are comparatively more robust than other control charts, especially for known distributions. Furthermore, control charts for unknown skewed process distributions under extreme ranked set strategies are relatively more robust for a small sample size, followed by other ranked set strategies-based control charts for a large sample size. Moreover, we have included a real-life example for the monitoring of ground water variables to highlight the application of our proposals.
AB - In this article, we have extended the design structures of dual auxiliary information-based control charts under a variety of sampling strategies and runs rules schemes. We have considered the cases of known and unknown skewed distributions by using the skewness correction (SC) method. The design structures under the skewness correction method are based on the degree of skewness of the study variable, amount of correlation between study variable and auxiliary variable, and sample size. We have investigated the performance of the developed structures in terms of probability of signals, false alarm rate and average run length by considering the symmetrical distribution, skewed distributions, heavy tailed distributions and contamination environments. Outcomes of the current article showed that control charts based on extreme ranked set strategies have higher probability of detecting an out-of-control signal and are comparatively more robust than other control charts, especially for known distributions. Furthermore, control charts for unknown skewed process distributions under extreme ranked set strategies are relatively more robust for a small sample size, followed by other ranked set strategies-based control charts for a large sample size. Moreover, we have included a real-life example for the monitoring of ground water variables to highlight the application of our proposals.
KW - auxiliary information
KW - contamination
KW - control chart
KW - distributions
KW - false alarm rate
KW - probability of signals
KW - robustness
KW - runs rules
UR - https://scholars.cityu.edu.hk/en/publications/on-the-extended-use-of-auxiliary-information-under-skewness-correction-for-process-monitoring(1f3b5157-c89c-4ad0-b818-6a583cbe71f7).html
U2 - 10.1177/0142331215622248
DO - 10.1177/0142331215622248
M3 - Article
VL - 39
SP - 883
EP - 897
JO - Transactions of the Institute of Measurement and Control
JF - Transactions of the Institute of Measurement and Control
IS - 6
ER -