Modelling generator maintenance scheduling costs in deregulated power markets

Keshav Dahal, Khalid Al-Arfaj, Krishna Paudyal

    Research output: Contribution to journalArticlepeer-review

    25 Citations (Scopus)
    132 Downloads (Pure)

    Abstract

    Generating companies use the maintenance cost function as the sole or main objective for creating the maintenance schedule of power generators. Usually only maintenance activities related costs are considered to derive the cost function. However, in deregulated markets, maintenance related costs alone do not represent the full costs of generators. This paper models various cost components that affect the maintenance activities in deregulated power markets. The costs that we model include direct and indirect maintenance, failures, interruptions, contractual compensation, rescheduling, and market opportunity. The loss of firm's reputation and selection of loyalty model are also considered using the Analytic Hierarchy Process (AHP) within an opportunity cost model. A case study is used to illustrate the modelling activities. The enhanced model is utilised in generator maintenance scheduling cases. The experimental results demonstrate the importance and impact of market related costs in maintenance schedules.
    Original languageEnglish
    Pages (from-to)551-561
    Number of pages11
    JournalEuropean Journal of Operational Research
    Volume240
    Issue number2
    Early online date14 Jul 2014
    DOIs
    Publication statusPublished - 16 Jan 2015

    Keywords

    • Maintenance
    • Opportunity cost
    • Deregulated market
    • Reputation
    • AHP

    Fingerprint

    Dive into the research topics of 'Modelling generator maintenance scheduling costs in deregulated power markets'. Together they form a unique fingerprint.

    Cite this