Critical factors affecting effective management of site personnel and operatives in confined site construction

John Spillane, Lukumon Oyedele, Jason Von Meding, Ashwini Konanahalli, Babatunde Jaiyeoba, Iyabo Tijani

Research output: Contribution to journalArticle

Abstract

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups, and a questionnaire survey were used in order to gain a comprehensive insight into the issues of management of personnel in a confined construction site environment. The following are the top five leading issues highlighted; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increasing profit margins. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.
Original languageEnglish
Pages (from-to)92-108
Number of pages17
JournalInternational Journal of Information Technology Project Management
Volume4
Issue number2
DOIs
Publication statusPublished - 2013

Fingerprint

personnel
Personnel
management
Contractors
Accidents
accident
Critical factors
Construction sites
accommodation
supervision
Profitability
profit
Productivity
productivity
traffic
industry
questionnaire
lack
interview
resources

Cite this

Spillane, John ; Oyedele, Lukumon ; Von Meding, Jason ; Konanahalli, Ashwini ; Jaiyeoba, Babatunde ; Tijani, Iyabo . / Critical factors affecting effective management of site personnel and operatives in confined site construction. In: International Journal of Information Technology Project Management. 2013 ; Vol. 4, No. 2. pp. 92-108.
@article{ed3fa4bec44d4c4c87f32c88fafdd429,
title = "Critical factors affecting effective management of site personnel and operatives in confined site construction",
abstract = "The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups, and a questionnaire survey were used in order to gain a comprehensive insight into the issues of management of personnel in a confined construction site environment. The following are the top five leading issues highlighted; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increasing profit margins. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.",
author = "John Spillane and Lukumon Oyedele and {Von Meding}, Jason and Ashwini Konanahalli and Babatunde Jaiyeoba and Iyabo Tijani",
year = "2013",
doi = "10.4018/jitpm.2013040106",
language = "English",
volume = "4",
pages = "92--108",
journal = "International Journal of Information Technology Project Management",
issn = "1938-0232",
publisher = "Idea Group Inc",
number = "2",

}

Critical factors affecting effective management of site personnel and operatives in confined site construction. / Spillane, John ; Oyedele, Lukumon; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde; Tijani, Iyabo .

In: International Journal of Information Technology Project Management, Vol. 4, No. 2, 2013, p. 92-108.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Critical factors affecting effective management of site personnel and operatives in confined site construction

AU - Spillane, John

AU - Oyedele, Lukumon

AU - Von Meding, Jason

AU - Konanahalli, Ashwini

AU - Jaiyeoba, Babatunde

AU - Tijani, Iyabo

PY - 2013

Y1 - 2013

N2 - The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups, and a questionnaire survey were used in order to gain a comprehensive insight into the issues of management of personnel in a confined construction site environment. The following are the top five leading issues highlighted; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increasing profit margins. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

AB - The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups, and a questionnaire survey were used in order to gain a comprehensive insight into the issues of management of personnel in a confined construction site environment. The following are the top five leading issues highlighted; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increasing profit margins. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

U2 - 10.4018/jitpm.2013040106

DO - 10.4018/jitpm.2013040106

M3 - Article

VL - 4

SP - 92

EP - 108

JO - International Journal of Information Technology Project Management

JF - International Journal of Information Technology Project Management

SN - 1938-0232

IS - 2

ER -