T1 - Assessment of barriers and strategies for the enhancement of off-site construction in India
T2 - an ISM approach
AU - Marinelli, Marina
AU - Konanahalli, Ashwini
AU - Dwarapudi, Rupesh
AU - Janardhanan, Mukund
N1 - Publisher Copyright:
© 2022 by the authors. Licensee MDPI, Basel, Switzerland.
PY - 2022/6/1
Y1 - 2022/6/1
N2 - The tremendous urbanization pace of India calls for higher efficiency in housing development, currently typified by low productivity and poor sustainability performance. Although off-site construction (OSC) is a method of widely acknowledged efficiency, its current uptake in India is very low, and the factors hindering its wider adaptation have not been comprehensively researched. This paper employs interviews with experts, a questionnaire survey and the interpretive structural modelling (ISM) technique to achieve the following objectives: first, to reveal which factors are perceived as top barriers for OSC implementation in India; second, to develop a hierarchical model presenting the causality between these factors; and third, to propose the initiatives required for barriers with high impact on other barriers to be most efficiently tackled. The survey findings show that the barriers perceived as most important from the professionals’ point of view are design inflexibility, difficulties in storage and transportation, supply chain weaknesses, initial capital requirements and lack of skills. The ISM reveals, though, that the underlying causes for these barriers lie with factors such as public procurement regulations and the fragmentation of the sector. Therefore, the latter are the barriers that need to be targeted in priority, as per the suggested strategies.
AB - The tremendous urbanization pace of India calls for higher efficiency in housing development, currently typified by low productivity and poor sustainability performance. Although off-site construction (OSC) is a method of widely acknowledged efficiency, its current uptake in India is very low, and the factors hindering its wider adaptation have not been comprehensively researched. This paper employs interviews with experts, a questionnaire survey and the interpretive structural modelling (ISM) technique to achieve the following objectives: first, to reveal which factors are perceived as top barriers for OSC implementation in India; second, to develop a hierarchical model presenting the causality between these factors; and third, to propose the initiatives required for barriers with high impact on other barriers to be most efficiently tackled. The survey findings show that the barriers perceived as most important from the professionals’ point of view are design inflexibility, difficulties in storage and transportation, supply chain weaknesses, initial capital requirements and lack of skills. The ISM reveals, though, that the underlying causes for these barriers lie with factors such as public procurement regulations and the fragmentation of the sector. Therefore, the latter are the barriers that need to be targeted in priority, as per the suggested strategies.
KW - India
KW - interpretive structural modelling (ISM)
KW - MICMAC analysis
KW - modern methods of construction (MMC)
KW - off-site construction (OSC)
UR - http://www.scopus.com/inward/record.url?scp=85131552785&partnerID=8YFLogxK
U2 - 10.3390/su14116595
DO - 10.3390/su14116595
M3 - Article
SN - 2071-1050
VL - 14
JO - Sustainability
JF - Sustainability
IS - 11
M1 - 6595
ER -