Skip to main navigation Skip to search Skip to main content

Application of performance measurement as an early warning system: a case study in the oil and gas industry

  • Sara Haji-Kazemi
  • , Bjørn Andersen

    Research output: Contribution to journalArticlepeer-review

    Abstract

    Purpose
    The purpose of this paper is to present an overview of the concept of early warning signs in projects and explain how a performance measurement system can be utilized as a source of data for an early warning approach signaling that a project is about to experience problems at some stage in the future.

    Design/methodology/approach
    Combination of action research and semi‐structured interviews and document analysis supplemented by a post‐mortem analysis after project close‐out.

    Findings
    Detection of early warning signals in projects can be better enabled through the application of a performance measurement system with properly defined key performance indicators. Utilization of this tool can positively affect the overall success of the project.

    Research limitations/implications
    The case study involved only one project from the oil and gas industry.

    Practical implications
    The empirical case study was developed to illustrate the usefulness of exploiting a performance measurement system in a project. A procedure was demonstrated for developing and implementing an early warning system based on performance measurement, and specific performance indicators have been described for other projects to copy.

    Originality/value
    This paper highlights the gap in the literature concerning the link between early warning and project management and the link between early warning and performance measurement. It offers a new idea on how performance measurement can be used as an effective early warning system and is intended to be primarily of use to project management practitioners and practically‐oriented academics who are interested in developing fresh insights into new approaches for better management of projects.
    Original languageEnglish
    Pages (from-to)714-738
    Number of pages25
    JournalInternational Journal of Managing Projects in Business
    Volume6
    Issue number4
    DOIs
    Publication statusPublished - 6 Sept 2013

    Keywords

    • early warning
    • key performance indicators
    • performance measurement
    • project management

    Fingerprint

    Dive into the research topics of 'Application of performance measurement as an early warning system: a case study in the oil and gas industry'. Together they form a unique fingerprint.

    Cite this