Engineering & Materials Science
Costs
100%
Disasters
98%
Insurance
80%
Risk assessment
71%
Neural networks
70%
Machine learning
64%
Deep learning
62%
Repair
57%
Rebar
54%
Economics
53%
Concrete construction
45%
Structural design
45%
Deep neural networks
43%
Structural optimization
42%
Land use
42%
Hazards
40%
Concrete slabs
40%
Steel structures
37%
Supervised learning
37%
Simulated annealing
35%
Reinforcement
34%
Life cycle
34%
Supply chains
34%
Learning algorithms
34%
Tunnels
34%
Concretes
33%
Backpropagation
32%
Accidents
30%
Uncertainty
30%
Sensors
29%
Trusses
29%
Contractors
28%
Calibration
26%
Structural analysis
26%
Risk analysis
25%
Industry
25%
Defects
23%
Topology
23%
Linear programming
21%
Steel
20%
Schematic diagrams
20%
Curve fitting
19%
Fabrication
19%
Travel time
18%
Reinforced concrete
17%
Cluster analysis
17%
Genetic algorithms
16%
Trucks
16%
Project management
16%
Big data
15%
Earth & Environmental Sciences
traffic
91%
project
81%
natural disaster
71%
loss
61%
road
61%
learning
57%
supervised learning
48%
transportation infrastructure
47%
machine learning
42%
corridor
40%
pavement
37%
tunnel
36%
damage
35%
accident
34%
incentive
34%
rehabilitation
33%
weather condition
33%
sensor
30%
project management
28%
insurance
25%
services
24%
land use
23%
economics
23%
decision
22%
natural hazard
22%
speed
19%
management plan
18%
trend
17%
evaluation
16%
central business district
13%
analytical framework
12%
calibration
9%
financial management
9%
methodology
8%
cost
8%
motorway
7%
risk assessment
7%
wind velocity
7%
budget
7%
prediction
7%
holistic approach
6%
urban traffic
6%
geological hazard
6%
rainfall
6%
method
6%
transportation system
6%
risk factor
6%
indicator
5%
data quality
5%
avalanche
5%
Business & Economics
Time Costs
74%
Incentives
69%
Decision Support Model
54%
Construction Industry
50%
Change Orders
49%
Contracting
45%
Investment in Energy
43%
Sensor
41%
Weather
35%
Performance Measurement
32%
Labour Productivity
32%
Gross Margin
31%
Demographics
30%
Costs
30%
Profitability
29%
Energy Saving
28%
Time Trade-off
26%
Trade-offs
25%
Transportation Management
22%
Performance
22%
Uncertainty
20%
Energy
20%
Evaluation
18%
Management Plan
18%
Energy Efficiency
16%
Alternatives
16%
Knowledge Gap
15%
Clustering Analysis
15%
Industry Performance
14%
Calibration
14%
Macroeconomic Performance
14%
User Cost
13%
Contractors
13%
Schedule
12%
Roadmap
11%
Stochastic Simulation
11%
Decision Maker
11%
Multi Criteria Analysis
11%
Internal Rate of Return
10%
Investors
10%
Motorway
9%
Integral
9%
Data Quality
9%
Optimal Investment
9%
Machine Learning
9%
Workforce
9%
Multi-criteria
8%
Robustness
8%
Investment Strategy
8%
Roads
8%